Africa Water Atlas
2010
https://doi.org/10.13140/RG.2.2.21001.65128…
7 pages
Sign up for access to the world's latest research
Abstract
Construction projects become complicated and fragmented so that many special contractors are involved. The most important aspect of the contractor's duties on any project is the effective management of materials, labour, time and safety. The management of project time is depending more and more on scheduling software. In such change environment, a proper planning, scheduling and costing are necessary for projects. This paper focuses on proper planning, scheduling, costing and critiques problems through interviews with professionals, data collection, and literature review. It proposes a new planning, scheduling and costing method, using different software applying (MS Project 2010, MS Excel).
Related papers
ijetrm journal, 2022
The construction industry is one of the most important activities that contribute towards the economic growth of any nation. However, the sector has been experiencing problems of cost and time overruns. This paper aims at developing an integrated scheduling approach for construction projects during the planning phase from a project owner's perspective. Many projects suffer time and cost overruns due to improper planning, scheduling and execution works that results in several issues like delay in providing facilities, development, reduction in quality of construction and making the project more expensive. Poorly managed projects cost all stakeholders a huge amount not just financially but also psychologically and emotionally. The study has shown that cost and time optimization model could yield impractical results unless double precedence relations are imposed between some activities such as excavation, Earthwork, Pitching and Concreting of a Project. It has also demonstrated that the cost and time budgeted during the planning phase would substantially deviate from actual if the planned construction start date slips from the plan, particularly for short period projects. The proposed approach demonstrated in the paper can sufficiently allow planning engineers to develop a comprehensive construction schedule so that the cost and time overruns in the lowest-bid awarded construction projects can be reduced. The paper provides empirical insights into how a robust construction schedule is developed from an owner's perspective. Cost-time optimization and risk analysis results obtained from manual computation might reduce the reasonable accuracy of the desired cost and schedule integration unless each activity is assigned its own calendar.
ijetrm journal, 2022
The construction industry is one of the most important activities that contribute towards the economic growth of any nation. However, the sector has been experiencing problems of cost and time overruns. Thus, the paper aims at developing an integrated scheduling approach for construction projects during the planning phase from a project owner's perspective. The study has shown that cost and time optimization model could yield impractical results unless double precedence relations are imposed between some activities such as excavation, Earthwork, Pitching and Concreting. It has also demonstrated that the cost and time budgeted during the planning phase would substantially deviate from actual if the planned construction start date slips from the plan, particularly for short period projects. The proposed approach demonstrated in the paper can sufficiently allow planning engineers to develop a comprehensive construction schedule so that the cost and time overruns in the lowest-bid awarded construction projects can be reduced. The paper provides empirical insights into how a robust construction schedule is developed from an owner's perspective. Cost-time optimization and risk analysis results obtained from manual computation might reduce the reasonable accuracy of the desired cost and schedule integration unless each activity is assigned its own calendar.
Civil Construction Project Management , 2020
Civil Construction Project Management has been so relevant in the actualizing of Civil Projects which in turn expands development in societies. Innovation in construction techniques has also relieved stress in Project execution. Management in Civil Construction can not be over emphasized in the modern advancement of technology as it helps to pursue human safety, human productivity, monitoring and execution of projects in time, and management of cost. This makes this topic essential in Civil Engineering.
International Journal of project …, 2003
Delay and cost overruns are common in construction projects and groundwater construction projects in Ghana are not an exception. The paper presents the results of a questionnaire survey conducted to identify and evaluate the relative importance of the significant factors contributing to delay and cost overruns in Ghana groundwater construction projects. Respondents of this survey included personnel from owners, consultants and contractors involved in groundwater projects in Ghana. The results of the study revealed the main causes of delay and cost overruns in construction of groundwater projects included: monthly payment difficulties from agencies; poor contractor management; material procurement; poor technical performances; and escalation of material prices. Hence, effective project planning, controlling and monitoring should be established to enhance project performance in order to minimise or avoid delay and cost problems in groundwater construction projects. #
Zenodo (CERN European Organization for Nuclear Research), 2021
Nigeria, over the years has experienced cost overruns and delays in construction of projects and the groundwater construction projects are inclusive. This study present result of a conducted questionnaire survey that identifies and evaluates the importance of the imperative factors responsible for the delay and cost overruns in Nigeria groundwater construction projects. The vital respondents of my survey cut across personnel's such as construction owners, construction consultants and recognized contractors involved in groundwater projects in Nigeria. The study's results expose the root causes of cost overruns and delays in the construction of groundwater projects: Inflation, delay in wages, mismanagement, poor material selection and procurement and low technical expertise. However, when excellent project planning, control and monitoring is established to improve project performance, delay and cost problems in groundwater construction projects dove tails.
2016
The main aim of this study was to investigate factors that influence completion of water projects in Kenya using Kakamega County as a case study. The specific objectives of the study were to determine the effect of client-related factors and contractor-related factors. The instrument of data collection was questionnaires. The target population consisted of 104 employees working for water projects in Mumias and Lugari, and also contractors and professionals who have been engaged in water projects in Kakamega County. Simple random and purposive sampling was used to select 90 respondents who formed the sample size. The response rate was 82%. The data was analyzed using descriptive statistics and correlation. The main factors that were associated with client included financial capacity, owner interference, the imposition of contract duration , decision-making ability, and change in project scope which had a positive relationship with project completion (r = 0.302, p <0.05). The contr...
The success or failure of any construction project begins from the planning stage. While project management can be observed to be a growing discipline in Nigeria, it is important that periodic assessment of how projects are managed is carried out from time to time. One way to assess how projects are managed is to assess the use of project management tools/ techniques in the execution of construction projects. This paper focuses on assessing the use of project management planning tools/ techniques in selected public and private institutions. A total of 32 firms/ organizations consisting of 10 governmental institutions and 22 private consultancy firms were surveyed. Well structured questionnaires were used to obtain data from the surveyed firms/ organizations. 78 questionnaires were distributed, 62 were returned and 56 (29 from private firms and 27 from public firms) were found suitable for analysis. The method used in analyzing and presenting the obtained data includes tables, percentiles, mean and correlation coefficient while the reliability of the research instrument was tested using Cronbach‘s alpha. 17 project management planning tools/ techniques were analyzed in this research based on the level of awareness and utilization. The result of the research analysis indicated that the basic project management planning tools/ techniques such as spreadsheets, benefit/ cost analysis, WBS, expert judgment and cost of quality, has the highest awareness and use both in the public/ government representative organizations and in private consultancy firms. Also, an increasing awareness of project management planning tools/ techniques was observed and that has also led to an increase in the use of project management planning tools/ techniques. The findings of this research therefore signifies the necessity of creating more awareness of advanced project management tools/ techniques, to ensure better performance.
The efficient management and delivery of construction projects in a constantly changing and fast developing construction industry have become the prime focus of most construction companies, estate developers and project managers globally. The factors that impede the successful and timely delivery of infrastructure projects differ from country to country, therefore this research investigates the causes of delays in delivering construction projects in a rapidly developing third world countries, like Nigeria. The objective of this paper is to identify the causes of delays, severity, appraise the effect in the Nigerian construction industry and evaluate their relevance to timely construction project delivery. A Bristol Online Survey (BOS) tool was used to collect the data sample of construction practitioners which includes 7 construction practitioner namely: Nigeria (7) mitigating factors. The projected survey aimed at 350 professionals but only 144 responded within the given timeframe. SPSS was used to analyze the data with Relative Importance Index (RII) used to rank the variables. The Results showed that poor project planning was the leading cause of delays, followed by cash-related causes such as diversion of funds, corruption and misappropriation of funds, whereas, time and budget overruns were established as core issues resulting from project delays. The research also revealed that lack of design knowledge and stakeholder's interference are the most crucial cause of delay. The findings of this study can be used to serve as a benchmark, it implementation into Civil engineering construction will help engineers adequately handle various project management methodologies in the delivery of construction projects and its recommendations for timely delivery of construction projects in Nigeria. Additionally, these findings seek to bridge the knowledge gap on the relevance in implementation of project management methodologies and delivery systems with a focus on Nigeria.
References (10)
- Mr. Jonathan A.N. Booth, Research Student Mr. William H. Askew, Lecturer Dr. Michael J. Mawdesley, Lecturer University of Nottingham Department of Civil Engineering University Park Nottingham NG7 2RD United Kingdom 1991- 92,pp 529-538.
- Faniran O Faniran, Peter E.D.Love & Heng Li, JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT / SEPTEMBER/OCTOBER, 1999, pp 311-319.
- Prof. Hira N Ahuja and Mr. Mir Saif -Uddin both faculties of Engineering and Applied Sciences Memorial University of New found land, St: John's, Canada.
- Sanjay Bhoyar, Dr. Dhananjay K. Parbat, International Journal of Emerging Technology and Advanced Engineering, 2014, pp 302-307.
- Babatunde Omoniyi Odedairo, Oluwabukunmi .A. Ogunsanya, Berkly Ogagaoghene Anaro, 2014, pp 15-23.
- K K Chitkara (2011) "Total Construction Project Management" Mc Graw Hill, International edition.
- L.S. SHRINATH (2012) "PERT & CPM Principles and its application" EAST-WEST Press PVT LTD, New Delhi.
- Richard Robinson and Bent Thagesen, Road Engineering For Development, Spon press,II New Fitter Lane, London.
- MORTH specification for road and bridge work, published by Indian road congress New Delhi, Edition: fourth-2005.
- Garold D. Oberlender, Project Management for Engineering and Construction, Tata McGraw hill.